Your indispensable partner in the oil sector
Home/Projects

Projects

Early production facilities, well testing and flow metering delivered for operators across Libya.

2019First well testing project
2,730Well tests, Jan to Oct 2025
13Testing units in the field
0Lost time incidents in EPF and well testing

Early Production Facilities

Fast-track facilities that bring production forward

Early production facilities are modular, quickly deployable and self-contained. They let operators start wells quickly, earn early revenue and collect reservoir data to guide future development.

AlfanOil has delivered mini EPFs and extended well test facilities for Zallaf, Waha Oil Company, Sirte Oil Company and Zueitina Oil Company, from first site visit through engineering, construction, commissioning and operation.

Featured Project

EPF 6P Harash

ClientWaha Oil Company
FieldGialo 59
TypeMini EPF

The client wanted to produce and sell oil quickly but had no production facility. The wells were drilled, but formation characteristics and reservoir behaviour were largely unknown, and high H2S made the site hazardous.

  • Facility up and running within one month
  • Flexible design that handles high water cut
  • H2S precautions, with its concentration measured periodically

Featured Project

6J Extended Well Test

ClientWaha Oil Company
FieldGialo 59
Year2025

Extended well testing flows new wells through a compact surface facility, so the operator can measure real production and reservoir behaviour before committing to permanent facilities.

  • Modular units that deploy quickly
  • AlfanOil EWT units handle up to 15,000 BLPD at 35% water cut
  • Skilled crews to operate and maintain the facility

Our Projects

Early production projects in Libya

Facilities delivered for four Libyan operators.

Mini EPF · 2023

Erawin Plan B

Zallaf · Erawin Field

15,000 BOPDInitial production

Mini EPF · 2023

Erawin Plan C

Zallaf · Erawin Field

10,000 BOPDInitial production
Case Study

Mini EPF · 2023

Gialo 6K

Waha Oil Company · Gialo 59

6,500 BOPDInitial production, plus 2 MMSCFD of gas

Mini EPF

6P Harash

Waha Oil Company · Gialo 59

1 monthFacility up and running
Case Study

Extended Well Test · 2025

6J EWT

Waha Oil Company · Gialo 59

15,000 BLPDEWT capacity at 35% water cut

Mini EPF · 2024

NC-101 Mathendous

Sirte Oil Company · Mathendous Field

3,418 BOPDInitial production
Case Study

Mini EPF · Dec 2024

NC-107 Camile

Sirte Oil Company · Camile Field

3,200 BOPDProduction

Mini EPF · 2025

Sabah

Zueitina Oil Company · Sabah Field

6,000 BOPDProduction

Well Testing and MPFM

Accurate well tests, field after field

AlfanOil runs a fleet of 13 testing units: 11 standard well testing units, 1 high pressure test separator and 1 bulk meter. Our HAIMO multiphase flow meters measure oil, gas and water directly at the wellhead, without a traditional test separator.

Units are installed at Zelten for Sirte Oil Company, at Gialo 59, Waha and Samah for Waha Oil Company, at El-Sharara for Akakus Oil Operations, at Chadar for Zallaf, and at Sabah for Zueitina Oil Company.

Well tests by client

January to October 2025, 2,730 tests in total

Akakus Oil Operations1,074
Waha Oil Company826
Zallaf604
Sirte Oil Company226

See how we solved it

Problem, solution and result for projects at Sirte Oil Company, Waha Oil Company, Akakus Oil Operations and Zallaf.

Case Studies

Experience

Experience across Libya’s oil and gas sector

AlfanOil supports Libyan operators across the production lifecycle.

Early production and extended well testing

Mini EPFs, extended well tests and three phase separator units rented, operated and staffed for Libyan operators.

Well testing and multiphase metering

Surface well testing, test separators and MPFM units across the Sirte, Murzuq and other Libyan basins.

Artificial lift

Supply, installation, commissioning, monitoring and repair of electric submersible pump systems for Libyan operators.

Production optimization

Real-time surveillance and remote operation of wells and facilities, with capacity control and engineering support.

Debottlenecking

Studies and upgrades that raise the capacity of permanent production facilities.

Well services

Workover, production logging, static pressure surveys and matrix acidizing for Libyan operators.

Our engineers also bring earlier regional experience in fabrication, piping, pressure vessels, skids and offshore tie-in work for projects in the UAE, Saudi Arabia, Kuwait, Iraq and India.

Our Clients

Clients we have served

Sirte Oil CompanyWaha Oil CompanyZallafAkakus Oil OperationsZueitina Oil CompanyMellitah Oil & GasHarouge Oil OperationsOMVMediterranean Oil Services

Get in Touch

Contact Us

Reach out by email or phone to discuss your needs.