Early Production Facilities fast track & Solution of Production

Project : MINI EPF NC101

Field : METKHANDOUSH

Client : SIRTE OIL COMPANY    

CLIENT PROBLEM STATEMENT

  • The client wanted to produce and sell their oil quickly, but had no production facility.
  • The wells is drilled but  Largely unknown formation characteristics & reservoir behaviors.
  • The wells in located in unsafe area .
  • Each well is located 16 Km away from the others
  • The Condition of road is not ready for establish any facility or transportation oil or mobilization Equipment.

ALFANOIL Solution

  • Bespoke but fast-track design process
  • Fast-track schedules from design to production start-up with our engineered modular designs takes 2 months
  • Cost-effective by minimizing your initial investment while optimizing production output.
  • Allow the client study the declined  of reservoir. Before build the temporally facility
  • The EPF  is flexible facility which challenge the issues during operation  such as  high water cut ,high viscosity Alfanoil overcome hose issues.

Other Case Studies